Completed projects

2010. 07. 15
Feed pump installation
More >
2010. 05. 15
The pump unit installation
More >
2009. 06. 17
Construction of circulation water block CWB-5 for hydrogen production plant for OJSC Mozyr Oil Refinery Plant (Belarus)

 

 

More >
2008. 11. 12
Delivery of stator for turbine generator TVV-800 to Ukraine
More >

Feed pump installation

Ekobana UAB participated in major construction project of Mogilev 2nd thermal power plant (Belarus) and changed the feed pump No 2 with hydrodynamic adjustable drive. Together with the specialists of manufacturer Nasosenergomash we executed installation, supervision and start-up works of electric pump unit APE 580-185-5 with electric motor AZM-4000/6-2UChL4 and hydraulic coupling made by Twin Disc.

The pump unit installation

Ekobana UAB has installed a network pump with electric drive and adjustable hydraulic coupling in the 2nd thermal power plant in Baranovichi (Belarus) that was under reconstruction. Into the new assembly ASE-1250-140-11GM we installed hydraulic coupling Transfluid 29 KSL and automatic control system. We also conducted maintenance and commissioning work of equipment installation.

Construction of circulation water block CWB-5 for hydrogen production plant for OJSC Mozyr Oil Refinery Plant (Belarus)

Construction of circulation water block CWB-5 for hydrogen production plant for OJSC Mozyr Oil Refinery Plant (Belarus) is the largest project that we completed in the field of industrial water circulation systems.

 

CWB-5 consists of three circulation water cycles:

-    CWC System I, capacity of the water cycle - 4.000 m3/h

-    CWC System II, capacity of the water cycle - 2.300 m3/h

-    CWC System IIa, capacity of the water cycle - 1.400 m3/h

 

Ekobana UAB has supplied following parts for the CWC systems:

-    CWC System I: fan cooling towers, coalescence oil separators, group of submersible hot water circulation pumps, group of submersible circulation pumps for chilled water, control system.

-    CWC System II: fan cooling towers, group of submersible circulation pumps for chilled water, control system.

-    CWC System IIa: fan cooling tower, group of submersible circulation pumps for chilled water, group of chemical pumps with dispensers, control system.

 

As part of this project we have selected and presented the equipment, performed the final installation, commissioning works, and also are performing warranty service.

 

Project construction and installation works were performed by OJSC Mozirskoye Montazhnoye Upravleniye Neftezavodmontazh, Mozir city.

Delivery of stator for turbine generator TVV-800 to Ukraine

In public auction arranged by the State enterprise Ignalina Nuclear Power Plant Ekobana UAB purchased the stator for turbine generator TVV-800 from the 1st Power Unit of Ignalina Nuclear Power Plant. The stator was dismantled and transported by a special transport to Ukrainian company.