Supplying the dismantling equipment for Building G1 of Ignalina NPP

VĮ "Ignalinos Atominė Elektrinė" (IAE)

UAB Ekobana, together with UAB Kauno Energetikos Remontas and UAB Svertas, successfully completed the project entitled Supply of Equipment for Dismantling of Building G1 at Ignalina Nuclear Power Plant.

THE FOLLOWING EQUIPMENT WAS SUPPLIED, INSTALLED, COMMISSIONED, AND PUT INTO OPERATION:

  • MAXIMA 1000x600-8/12, an automatic dry shot blasting unit.
  • A gantry crane with a lifting capacity of 15 tonnes.
  • A vessel rotator.

The work was completed on time and to the full satisfaction of the client.

It should be noted that 7 trucks of goods were delivered under this project.

2013
year started
7
tractor trucks
2013
year of project delivery