Upgrading hydrogen generator
UAB "Vilniaus energija"
Old electrolyzers SEU-10 were dismantled in Power Station No 3 of UAB Vilniaus Energija. They were replaced by Hogen electrolyzers, which were commissioned and staff training was performed. To ensure the efficiency of the new units, a reverse osmosis water treatment system was installed. The new electrolyzer has a capacity of 4 nm3/h x 2.
The following equipment was delivered, installed, commissioned and handed over for operation:
- The old electrolyzers SEU-10 were dismantled.
- Hogen electrolyzers were selected, installed, commissioned, and staff training was performed.
- To ensure the efficiency of the new units, a reverse osmosis water treatment system was installed.
2005
year started7
month of implementation2005
year of project delivery