Construction of a flue-gas desulphurization unit in Estonia

  • Capacity of 280000 m3/h.
  • The system for continuous control of waste (part of the FGD project) was certified in accordance with the QAL 2 requirements under EN14181.

More about the project

The grain elevator equipment installed by us has the highest capacity in Lithuania.

SUPPLIED THE FOLLOWING EQUIPMENT:

  • Grain storage silos, 6 units x 10340 m3, measuring 25,66 m in diameter, and their equipment (level measuring sensors, aeration system, temperature monitoring system, etc.)
  • Unloading augers for grain, 6 units x 1200 t/h
  • Flow deceleration units, 2 pcs.

More about the project

Project B16: controlled shunt reactor at INPP 330 kV switchyard

  • Designing the CSR unit
  • Delivering the equipment and construction, assembly and commissioning works.

The reactor start-up and adjustment tests were completed in September of 2008 and the reactor is currently in operation.

More about the project

Work done at Ignalina Nuclear Power Plant

  • Mechanical and electrical installation works in the general project B234.
  • Construction of new solid radioactive waste management and storage complex at Ignalina Nuclear Power Plant.

More about the project

SERVICES

COMPLEX
PROJECT MANAGEMENT

SOLUTIONS FOR INDUSTRIAL ENTERPRISES

areas of activity

  • Construction, reconstruction and modernization of electrical grid substations up to 400 kV
  • Construction, reconstruction and modernization of industrial and plant energy systems and objects
  • Construction of generating capacities on the basis of steam and gas turbines;
  • Construction, reconstruction and modernization of community utility facilities;
  • Design and fabrication of modular boiler-houses
  • And much more
  • Equipment for transformer substations with voltages up to 400 kV
  • Power transformers up to 400 kV
  • Cabling and wiring products, electrical installation products
  • Uninterruptible power systems, dynamic UPS
  • Power boilers, boiler equipment
  • And more
  • Mechanical, low-current network and other electrical works on the construction project of the Slid Waste Management and Storage FAcility (SWMSF) at Ignalina Nucliear Power Plant (INNP)
  • Supply of equipment for dismantling G1 building at Ignalina NPP
  • Low-current network and other electrical works on the construction project of the new Independent Spent Fuel Storage Installation (ISFSI) at INPP
  • And more.
  • The overall B16 management project is a turnkey installation for 330 kW swithyard at Ignalina NPP of a controlled bypass shunt reactor with a capacity of 180 MVAr for compensation of excessive reactive power
  • Reconstruction of the Siaurine 110/10/10 kV transformer substation in Vilnius. 110/10/10 kV 63 MVA power transformers have been supplied, technical and detailed design has been prepared, installation, pre-commissioning activities have been done, testing
  • Turnkey construction of a new power plant with a 27 MW turbo-generator and turnover cycle system of water cooling at the Northern CHP VKG OU in Kohtla-Jarve, Estonia
  • Management of construction of the workshop for feed phoshated under the project - increasing the efficiency of AB Lifosa and introduction of innovative technologies while modernising the production process of feed phosphates
  • Construction of plant for the production of feed phosphates at AB Lifosa, Lithuania
  • Supply of shut-off valves and pumps for overhauling the Orlen Lietuva refinery, Lithuania
  • Supply of equipment for the lake water filtration system for the Myanmar iron foundry
  • Supply and supervised installation of pumps, agitators and control cabinets for the reconstruction of treatment facilities on Grodno Azot, Belarus
  • Supply of shut-off valves and pumps for the shale-processing plants Petroter II and Petroter III, Estonia
  • And more
  • Expansion of the water supply and sewerage system in Anyksciai, Lithuania
  • Reconstruction of treatment facilities in Panevėžys, Lithuania
  • Construction and reconstruction of water supply and sewerage networks in Trakai and Lentvaris, LIthuania
  • Reconstruction of boiler room No. 3 of the Zhodino CHP Plant in Borisov, Belarus
  • Modernisation of the hydrogen production site at the CHO plant in Vilnius and Kaunas, Lithuania
  • And more
  • Construction of a new condensing turbine for a 27 MW power plant with a cooling system, Estonia
  • Supply of power transformers 25-100 kVA and 160-1600 25-100 kVA, 10/0,4-0,42 kV, Lithuania, Estonia
  • Replacement of steam turbine and generator 6 MW, Estonia
  • Reconstruction of "Siaurine" transformer substation 110/10 kV in Vilnius, Lithuania
  • Supply of two unit transformers of 330 kV, 215 MVA for the modernisation project of the Plavinu condenser-type thermal power plant, Latvia
  • And more.
Supply of grain storage equipment for Lithuanian farmers
Supply of grain storage equipment for Lithuanian farmers
Lithuanian farmers
Replacement of power transformer T-1 at the 110/10 kV Palemonas transformer substation
Replacement of power transformer T-1 at the 110/10 kV Palemonas transformer substation
AB "Energijos skirstymo operatorius"
Construction of a flue-gas desulphurization unit in Estonia
Construction of a flue-gas desulphurization unit in Estonia
VKG Energia OU
Work done at Ignalina Nuclear Power Plant
Work done at Ignalina Nuclear Power Plant
VĮ "Ignalinos atominė elektrinė" (IAE)
The grain elevator equipment installed by us has the highest capacity in Lithuania.
The grain elevator equipment installed by us has the highest capacity in Lithuania.
KJKK "BEGA"
Replacing power transformers at the 110/10 kV Šiaurinė transformer substation in Vilnius
Replacing power transformers at the 110/10 kV Šiaurinė transformer substation in Vilnius
AB "Lesto"
Construction of a dry bulk terminal
Construction of a dry bulk terminal
UAB "Malkų įlakos terminaras"
Supplying the dismantling equipment for Building G1 of Ignalina NPP
Supplying the dismantling equipment for Building G1 of Ignalina NPP
VĮ "Ignalinos Atominė Elektrinė" (IAE)
Installing a fan cooling tower at VKG Oil AS
Installing a fan cooling tower at VKG Oil AS
VKG Oil AS
Reconstruction of the 330/110/10 kV transformer substation in Klaipėda
Reconstruction of the 330/110/10 kV transformer substation in Klaipėda
AB "Lietuvos energija"
Reconstruction of 330 kV installations at the 330/110/10 kV transformer substation in Kaunas
Reconstruction of 330 kV installations at the 330/110/10 kV transformer substation in Kaunas
AB "LITGRID"

ABOUT US

UAB Ekobana provides integrated solutions in the fields of industry and energy, implements projects of any complexity "up to the key" - from search of possibilities of financing to putting object into operation. A team of competent and experienced professionals is capable of successfully managing a project from its inception to the end or joining at any stage of the project's implementation.

CERTIFICATES

  • Certificate confirming compliance of management system with ISO 9001: 2015, ISO 14001: 2015, BS OHSAS 18001: 2007

  • The license is intended to carry out activities in the ionizing radiation environment of a nuclear facility.

  • Qualification Certificate No. 6279. Right to be a special contractor for building construction.

News
UAB Ekobana has renewed and appended existing qualification certificate SPSC
2018
MAY 07
UAB Ekobana has renewed and appended existing qualification certificate SPSC
UAB "Ekobana" took part in exhibition "What will you sow 2018" (ориг. „Ką pasėsi 2018“)
2018
MAR 27
UAB "Ekobana" took part in exhibition "What will you sow 2018" (ориг. „Ką pasėsi 2018“)
Electrical equipment for 110/6/6 kV transformers substation
2018
FEB 01
Electrical equipment for 110/6/6 kV transformers substation
Oil transformers
2018
JAN 09
Oil transformers